Design Engineers Mechanical / Electrical - Drake And Scull - UAE
- By UAE Job Bank
- Published 10/30/2011
- Engineering Electrical , Engineering Mechanical , UAE
Review of tender document including the scope of work, specifications, value engineering, tender bulletins, bill of quantities, technical offer, technical clarification, and list of deviation to the specification, list of deviation to the scope of work.
Review the “Issued for Construction” drawings and other document.
Review of the index of tender document (prepared by project secretary).
Review changes between tender and construction document. These changes shall be prepared by the Quantity Surveyor (QS).
Attend all technical meetings (Internal meetings, meetings with the main contractor or with the consultant).
General review with the Senior Design Engineers of other disciplines, all MEP layouts in order to highlight any problem that might occur.
Check the document register of shop drawings related to this discipline.
Check the Material submittal schedule.
Prepare the request for information (RFI).
Review with the Design Engineer all shop drawing prepared and checked by the design engineer.
Check Material Take Off prepared by the Design Engineer and issue inquiry to Procurement Dept.
Review and submit the technical material submittal forwarded from procurement department.
Follow up on the material submittal approval with the consultant and main contractor and resubmit, if required, any commented material submittal with final approval.
Issue the site requisition of the approved material once the Material Take Off is made based on approved shop drawings.
Make sure the Purchase order for the above issued site requisition is issued.
To clarify with the consultant any discrepancy between various contract documents.
Committed to DSI HSE requirements and all applicable legislation and contractual requirements affecting the HSE activities at project site and administrative offices
Apply Online
Review the “Issued for Construction” drawings and other document.
Review of the index of tender document (prepared by project secretary).
Review changes between tender and construction document. These changes shall be prepared by the Quantity Surveyor (QS).
Attend all technical meetings (Internal meetings, meetings with the main contractor or with the consultant).
General review with the Senior Design Engineers of other disciplines, all MEP layouts in order to highlight any problem that might occur.
Check the document register of shop drawings related to this discipline.
Check the Material submittal schedule.
Prepare the request for information (RFI).
Review with the Design Engineer all shop drawing prepared and checked by the design engineer.
Check Material Take Off prepared by the Design Engineer and issue inquiry to Procurement Dept.
Review and submit the technical material submittal forwarded from procurement department.
Follow up on the material submittal approval with the consultant and main contractor and resubmit, if required, any commented material submittal with final approval.
Issue the site requisition of the approved material once the Material Take Off is made based on approved shop drawings.
Make sure the Purchase order for the above issued site requisition is issued.
To clarify with the consultant any discrepancy between various contract documents.
Committed to DSI HSE requirements and all applicable legislation and contractual requirements affecting the HSE activities at project site and administrative offices
Apply Online